Classroom activity
Consider piece recognition, handling, storage and repeated use.

Pages use confirmed public information only. Missing or unverified items are shown as “Pending upload.”
Reconfirmed by projectAudience, channel, intended age and target date.
Pieces, size, board, surface, tooling and pack.
Colour, structure, feel, tolerances, tests and records.
Quantity, pack-out, approvals and destination.
Relevant sourcing scenarios
These are application routes, not unverified customer cases.
Consider piece recognition, handling, storage and repeated use.
Balance finished size, piece count, available floor space and pack volume.
Give maps, architecture, art or destination content a larger visual field.
Review age, material, packaging and destination tests together.
Sourcing decision matrix
Status separates documented records, project review and missing evidence.
| Decision | Why it matters | Current status |
|---|---|---|
| Finished size | Use space, artwork ratio, piece count and packing limits shape the format. | Documented example |
| Piece handling | Area, thickness and edge treatment should suit the intended user. | Pending upload |
| Flatness and warp | Large-area mounting, moisture and grain direction need agreed acceptance methods. | Pending upload |
| Pack volume | Box, stacking, inner bag and master carton directly affect transport. | Project review |
| Durability and testing | Repeated use, intended age and sales market define the evidence scope. | Project review |

Company-supplied production material · Visible work only
Manufacturing & quality
Check artwork, size, language, age and market.
Confirm board direction, construction and existing or new tool.
Record colour, pieces, surface and pack approval.
Produce from approved files and material batches.
Check registration, edges, pieces and component count.
Release against BOM, carton and final inspection.
Inputs needed from the buyer
An incomplete brief can still start, while open items remain visible and never become an automatic capability promise.
Database materials, finishes & packaging
Material, finish and packaging directions may be introduced, while the exact combination, thickness, tolerance and production-file parameters must follow the applicable template and prepress review.
Historical reference range 1.5-2.0 mm; the project value remains to be confirmed
Suitability follows material, size, quantity and sample review.
A box name does not confirm load, dimensions or production route.
A 3 mm or 5 mm bleed may be selected; the two values do not conflict. Use the value stated in the applicable product template, dieline or project confirmation. The final file format likewise follows the project template and prepress review.
Follow the project template and prepress checkCase-study structure
Customer approval and records required
Product FAQ
Yes. Current records include a 48-piece format at about 91.3 × 61.3 cm, while tooling condition and board still require quotation-stage confirmation.
Scale changes handling, flatness, mounting, tooling, packaging and freight, so the product needs its own construction review.
You can submit the target, but the page does not promise a universal limit. Engineering must check material, equipment, tooling, packing and logistics.
Floor & Jumbo Puzzles