Information notePublic information checked

Pages use confirmed public information only. Missing or unverified items are shown as “Pending upload.”

Reconfirmed by project
01Define the use

Audience, channel, intended age and target date.

02Set the construction

Pieces, size, board, surface, tooling and pack.

03Approve evidence

Colour, structure, feel, tolerances, tests and records.

04Plan the run

Quantity, pack-out, approvals and destination.

Relevant sourcing scenarios

Where Coloring Puzzles may fit.

These are application routes, not unverified customer cases.

01

Children’s creativity

Balance guided outlines, free coloring, puzzle difficulty and age.

02

Learning activity

Build around a lesson, theme and display after completion.

03

Event interaction

Consider session time, tools, table protection and take-home storage.

04

Gift set

Confirm puzzle, tools, instructions, insert and packaging as one product.

Sourcing decision matrix

Resolve these points before quotation.

Status separates documented records, project review and missing evidence.

DecisionWhy it mattersCurrent status
Drawing mediumDefine crayon, coloured pencil, marker or another tool first.Pending upload
Surface stockAbsorption, bleed, rub, drying and cut behaviour require samples.Pending upload
Printed outlineGround density and open coloring areas shape the experience.Project review
Supplied toolsQuantity, brand, sourcing responsibility and safety files are unverified.Pending upload
Pack and ageRetention, instructions and age labelling follow destination requirements.Pending upload
Company-supplied production-floor photo showing visible paper-product handling work

Company-supplied production material · Visible work only

Manufacturing & quality

Carry the brief through six control points.

  1. 01
    Files & intended use

    Check artwork, size, language, age and market.

  2. 02
    Board & tooling

    Confirm board direction, construction and existing or new tool.

  3. 03
    Sample approval

    Record colour, pieces, surface and pack approval.

  4. 04
    Print & mounting

    Produce from approved files and material batches.

  5. 05
    Cutting & inspection

    Check registration, edges, pieces and component count.

  6. 06
    Pack-out & release

    Release against BOM, carton and final inspection.

Inputs needed from the buyer

A practical file list for the project coordinator.

An incomplete brief can still start, while open items remain visible and never become an automatic capability promise.

  1. 01Drawing medium to be usedMarked Pending upload when not supplied
  2. 02Base artwork, line art and coloring zonesMarked Pending upload when not supplied
  3. 03Intended age and sales countryMarked Pending upload when not supplied
  4. 04Piece count, size and quantityMarked Pending upload when not supplied
  5. 05Whether tools should be includedMarked Pending upload when not supplied
  6. 06Pack, test and delivery requirementsMarked Pending upload when not supplied

Database materials, finishes & packaging

Show reviewable directions without publishing one universal specification.

Material, finish and packaging directions may be introduced, while the exact combination, thickness, tolerance and production-file parameters must follow the applicable template and prepress review.

01

Material directions

  • Grey board
  • Blue-core paper
  • White-core paper
  • Black-core paper

Historical reference range 1.5-2.0 mm; the project value remains to be confirmed

02

Surface & forming directions

  • Gloss, matte and tactile lamination directions
  • Scratch-resistant surface-protection direction
  • Foil, texture, spot UV and emboss/deboss directions
  • Shaped die cutting and window directions

Suitability follows material, size, quantity and sample review.

03

Packaging directions

  • Lid-and-base box
  • Tuck or lock-bottom carton
  • Drawer box
  • Book-style box
  • Gift box
  • Magnetic presentation box

A box name does not confirm load, dimensions or production route.

Prepress selection rule

A 3 mm or 5 mm bleed may be selected; the two values do not conflict. Use the value stated in the applicable product template, dieline or project confirmation. The final file format likewise follows the project template and prepress review.

Follow the project template and prepress check

Case-study structure

Customer approval and records required

Reserve the case structure without inventing a customer or result.

Customer and market
Pending upload
Original challenge
Pending upload
Qinyi solution
Pending upload
Verified result
Pending upload
Exact coloring-puzzle product image pending upload
Exact product image pending upload · Case facts await customer approval

Product FAQ

Lead with known facts and state the open boundary.

Is coloring-puzzle capability currently confirmed?+

No. This is a development category; surface stock, tool compatibility, suppliers and safety evidence remain unverified.

Can crayons or markers be packed with the product?+

That can be submitted as a requirement, while sourcing responsibility, brand, quantity, pack and compliance files need separate review.

Which inputs matter most?+

Drawing medium, intended age, destination, base art, puzzle format and safety requirements directly determine the development route.

Coloring Puzzles

Turn the available inputs into a reviewable production brief.

Submit this product brief
Submit a project brief